Copyright Anston-Greenlees, Inc 2017

Projects - Specialty System Projects

WUFT – TV/FM, BR-180, Weimer Hall Addition

Mechanical and electrical engineer for the a major addition to the existing Weimer Hall for a new master control, radio reading rooms, production rooms and office space. Design included new air conditioning, plumbing, fire protection, electrical service, lighting, voice/data network infrastructure and fire alarm. The HVAC design required very special care for noise control.

Veterinary Hospital HVAC Renovation and Central Plant Expansion

Electrical engineer for master planning and design for this $9 million, multi-phased project. The project consisted of a complete renovation of the hospital's HVAC system including a new 850-ton chiller and associated equipment. The electrical design required a new 15 KV underground service, two pad-mounted transformers and selector switch for redundancy, numerous motor control centers, and complete re-lighting of the entire facility. The facility included specialized labs, surgical suites, treatment areas, and animal holding areas.

Chiller Plant Addition and Renovation

Shands Hospital

Electrical engineering design services for master planning the expansion of the hospital’s central plant, including a circuit breaker coordination study and short circuit study for the addition of a 1,350 ton chiller to the hospital's central chiller plant. Project included planning and design of 4,160 volt services to expand the plants electrical capacity.

5th and 6th Floor Renovation

Shands Hospital

Designed normal and emergency power distribution, lighting, nurse call, fire alarm, music/page, plus computer surge protection. Project consisted of renovating existing space into patient rooms, specialized examination rooms, offices, and a nurse training area.